{"id":51440,"date":"2025-11-20T14:03:32","date_gmt":"2025-11-20T13:03:32","guid":{"rendered":"https:\/\/technofluid.it\/?p=51440"},"modified":"2025-11-20T14:03:32","modified_gmt":"2025-11-20T13:03:32","slug":"certificazioni-impianti-industriali-guida-per-aziende","status":"publish","type":"post","link":"https:\/\/technofluid.it\/en\/industrial-plant-certifications-guide-for-companies\/","title":{"rendered":"Industrial plant certifications \u2013 guide for companies"},"content":{"rendered":"<h2>Introduction<\/h2>\n<h3>Role of certifications<\/h3>\n<p>Consider that certifications demonstrate regulatory compliance and reduce operational risks; they help you structure controls, inspections, and maintenance for complex plants.<\/p>\n<h3>Benefits for the company<\/h3>\n<p>Moreover, by adopting them you improve safety, reliability, and competitiveness, allowing you to access regulated markets and protect the production assets.<\/p>\n<h2>Regulatory and legislative framework<\/h2>\n<p>In the current regulatory landscape, you must consider both national standards and European directives, as together they determine safety requirements, responsibilities, and verification procedures for industrial plant certifications.<\/p>\n<p>Keep in mind that you must keep the technical documentation and the declaration of conformity: these documents are essential to demonstrate compliance and to face inspections or administrative checks.<\/p>\n<h3>Ministerial Decree 37\/08 and the compliance obligation<\/h3>\n<p>According to DM 37\/08, you must rely on authorized entities for the design, installation, and testing of plants, as well as request the declaration of conformity at the end of the work.<\/p>\n<p>You need to verify compliance with applicable technical standards and keep the documentation updated, because responsibility can fall on both the installer and the client in case of non-compliance.<\/p>\n<h3>European directives and harmonization of technical standards<\/h3>\n<p>Regarding European directives, you must follow harmonization procedures that simplify the free movement of products and impose markings and certifications based on harmonized standards.<\/p>\n<p>It is also important that you monitor updates to EN standards and European guidelines, as adopting harmonized standards facilitates conformity assessment and reduces legal risks.<\/p>\n<h2>Certifications for electrical and special plants<\/h2>\n<p>When assessing compliance and certifications for electrical and special plants, you must consider CEI standards, markings, and specific testing procedures for each operating environment.<\/p>\n<p>To ensure operational continuity and safety, you will need to integrate periodic inspections, record suitability tests, and prepare the technical documentation required by notified bodies.<\/p>\n<h3>Safety requirements for grounding and surge protection<\/h3>\n<p>Ensure that grounding complies with resistance and dispersion values required by standards and that you request traceable connections and measurement points in conformity reports.<\/p>\n<p>Check for the presence of protection systems against surges and atmospheric discharges; you will need to include field tests and maintenance procedures in safety plans.<\/p>\n<h3>Certification of plants in potentially explosive atmospheres (ATEX)<\/h3>\n<p>Consider the classification of risk zones, evaluating gases, vapors, or dusts and adapting components and procedures to the applicable ATEX directive.<\/p>\n<p>Request certifications for equipment and declarations of conformity, as well as specific training for personnel responsible for installation and maintenance.<\/p>\n<p>Furthermore, for existing plants, you will need to perform updated risk assessments, compatibility tests, and periodic control plans to maintain compliance over time.<\/p>\n<h2>PED Directive and pressure equipment<\/h2>\n<p>Consider that the PED Directive governs essential safety requirements for pressure equipment and assemblies; you must ensure compliance before commissioning and guarantee complete technical documentation.<\/p>\n<p>Remember that CE marking and the declaration of conformity remain mandatory for the subject categories; you are responsible for keeping files, material certificates, and test reports for future inspections.<\/p>\n<h3>Classification of pressure equipment and vessels<\/h3>\n<p>In practice, classification is based on the pressure\/volume product (PS\u00b7V) and the fluid group; you must determine the category (I-IV) to choose the appropriate certification path.<\/p>\n<p>Therefore, the category affects design checks, tests, and involvement of the notified body; you will need to adjust design, non-destructive testing, and material traceability according to the class.<\/p>\n<h3>Verification and commissioning process with certification bodies<\/h3>\n<p>After the compliance analysis, you must provide the technical file, test plans, and calculation documents to the certification body, which will carry out audits, factory inspections, and pressure tests for certificate issuance.<\/p>\n<p>Finally, the commissioning phase includes final verification, issuance of the CE certificate, and delivery of documents to the plant manager; you must then apply markings and prepare the maintenance plan.<\/p>\n<p>In-depth: to facilitate the process with the certification body, prepare welding logs, material certificates, NDT reports, and test procedures; allow time for site inspections, dynamic tests, and design corrections to avoid delays in certificate delivery.<\/p>\n<h2>Declaration of Conformity (DoC)<\/h2>\n<p>Remember that the Declaration of Conformity certifies that the plant complies with technical and safety standards: you must issue it only after completing design verifications, material checks, and functional tests.<\/p>\n<p>Verify that the DoC includes plant identification, reference standards, signatures, and date; you must keep it along with the technical documentation for inspections and regulatory obligations.<\/p>\n<h3>Essential elements and mandatory technical attachments<\/h3>\n<p>Check that the attachments include electrical diagrams, sizing calculations, test reports, and component certifications, as their absence compromises the validity of the DoC.<\/p>\n<p>Also attach the operating and maintenance instructions, material certificates, and safety test reports; you are responsible for their proper archiving and accessibility.<\/p>\n<h3>Civil and criminal liabilities of the employer and installer<\/h3>\n<p>Assume that as an employer you must ensure training, risk assessment, and preventive measures, and that the installer is responsible for technical compliance and proper execution.<\/p>\n<p>Consider that omissions, falsified documents, or missing tests can lead to administrative sanctions, compensation claims, and criminal proceedings; you must implement procedures to reduce these risks.<\/p>\n<p>Document every phase with reports, test checklists, and photographs: in case of disputes, this evidence helps demonstrate the diligence and technical choices made by you and your suppliers.<\/p>\n<h2>Safety and Machinery Directive<\/h2>\n<p>Consider that compliance with the Machinery Directive requires documented risk assessment and integrated protective measures; you will need to implement barriers, safety devices, and procedures that reduce residual risks in line with harmonized standards.<\/p>\n<p>Verify responsibilities among manufacturer, integrator, and user: you must define who performs maintenance, staff training, and periodic checks to maintain the operational safety conditions of the machinery.<\/p>\n<h3>Integration between industrial plants and served machinery<\/h3>\n<p>When integrating plants and served machinery, you must assess electrical, software, and mechanical interfaces to avoid unforeseen effects; integrate logical protections and redundancies according to EN ISO 13849 or IEC 62061.<\/p>\n<p>Make sure to draft lockout-tagout procedures, on-site test plans, and document integration tests; change traceability and operator training are essential for operational safety.<\/p>\n<h3>CE marking and preparation of the technical file<\/h3>\n<p>Document in the technical file the risk assessment, design specifications, electrical diagrams, test results, and user instructions: you are responsible for keeping these documents updated to demonstrate compliance.<\/p>\n<p>Remember that CE marking involves the declaration of conformity: if you make substantial changes, you must reassess conformity and, if necessary, update the file and safety documentation.<\/p>\n<p>Summarize with a practical checklist: identification of applicable standards, risk analysis, list of safety devices, test reports, user manuals, and quality control records; you must ensure complete traceability of critical components.<\/p>\n<h2>Periodic inspections and maintenance<\/h2>\n<p>Proceed with a plan of periodic inspections specifying frequencies, responsibilities, and acceptance criteria; integrate in the plan the <a href=\"https:\/\/www.writec.com\/blog\/documentazione-tecnica-per-macchine-e-impianti-tutto-quello-che-devi-sapere\" target=\"_blank\" rel=\"nofollow noopener noreferrer\">Technical documentation for machines and plants<\/a> as a reference for procedures and declarations of conformity.<\/p>\n<p>Make sure you perform preventive checks and scheduled maintenance to reduce downtime and accidents, recording each intervention with date, operator, and technical feedback.<\/p>\n<h3>Schedule of mandatory inspections and controls<\/h3>\n<p>Organize a digital schedule highlighting mandatory inspections (e.g., safety, pressure, emissions) and their regulatory deadlines, adapting it to plant modifications.<\/p>\n<p>Keep in mind to prioritize critical activities and set automatic reminders to avoid delays and penalties, involving the responsible personnel.<\/p>\n<h3>Management of the maintenance log and document updating<\/h3>\n<p>Record each intervention in the maintenance log indicating description, replaced spare parts, and times, to reconstruct the history and facilitate any fault analysis.<\/p>\n<p>Update technical documentation and maintenance plans after each plant modification, ensuring that procedures reflect the actual status and regulatory requirements.<\/p>\n<p>Keep the log in electronic format with backup and tracked access; you can integrate photos, part certificates, and test reports for immediate audit and to simplify compliance activities.<\/p>\n<h2>Industrial plant certifications \u2013 guide for companies<\/h2>\n<p>You must obtain certifications to demonstrate compliance with standards (CE, ISO, ATEX, PED), ensuring safety, energy efficiency, and reliability of plants. Plan technical assessments, project documentation, functional tests, and maintenance plans; collaborate with notified bodies and qualified professionals to reduce risks and legal liabilities.<\/p>\n<p>In conclusion, evaluate the essential certifications for your sector, schedule periodic audits, and choose accredited bodies: this way you protect people, the environment, and production continuity, improving competitiveness and regulatory compliance.<\/p>","protected":false},"excerpt":{"rendered":"<p>Introduzione Ruolo delle certificazioni Considera che le certificazioni dimostrano conformit\u00e0 normativa e riducono i rischi operativi; ti aiutano a strutturare [&hellip;]<\/p>\n","protected":false},"author":4,"featured_media":51442,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"site-sidebar-layout":"default","site-content-layout":"","ast-site-content-layout":"default","site-content-style":"default","site-sidebar-style":"default","ast-global-header-display":"","ast-banner-title-visibility":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","ast-disable-related-posts":"","theme-transparent-header-meta":"default","adv-header-id-meta":"","stick-header-meta":"","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","astra-migrate-meta-layouts":"set","ast-page-background-enabled":"default","ast-page-background-meta":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"ast-content-background-meta":{"desktop":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"footnotes":""},"categories":[8151],"tags":[],"class_list":["post-51440","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v26.7 (Yoast SEO v26.9) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Certificazioni impianti industriali: guida completa per aziende<\/title>\n<meta name=\"description\" content=\"Scopri come ottenere le certificazioni impianti industriali per garantire sicurezza, conformit\u00e0 e competitivit\u00e0. Leggi la guida per aziende ora!\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/technofluid.it\/en\/industrial-plant-certifications-guide-for-companies\/\" \/>\n<meta property=\"og:locale\" content=\"en_GB\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Certificazioni impianti industriali - guida per aziende\" \/>\n<meta property=\"og:description\" content=\"Scopri come ottenere le certificazioni impianti industriali per garantire sicurezza, conformit\u00e0 e competitivit\u00e0. Leggi la guida per aziende ora!\" \/>\n<meta property=\"og:url\" content=\"https:\/\/technofluid.it\/en\/industrial-plant-certifications-guide-for-companies\/\" \/>\n<meta property=\"og:site_name\" content=\"Technofluid\" \/>\n<meta property=\"article:published_time\" content=\"2025-11-20T13:03:32+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/technofluid.it\/wp-content\/uploads\/2026\/02\/xv3yifpeve4.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1600\" \/>\n\t<meta property=\"og:image:height\" content=\"1200\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"w4y\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"w4y\" \/>\n\t<meta name=\"twitter:label2\" content=\"Estimated reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"8 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/technofluid.it\/certificazioni-impianti-industriali-guida-per-aziende\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/technofluid.it\/certificazioni-impianti-industriali-guida-per-aziende\/\"},\"author\":{\"name\":\"w4y\",\"@id\":\"https:\/\/technofluid.it\/#\/schema\/person\/80ee7c2040b86b800d310c42f0e4916e\"},\"headline\":\"Certificazioni impianti industriali &#8211; guida per aziende\",\"datePublished\":\"2025-11-20T13:03:32+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/technofluid.it\/certificazioni-impianti-industriali-guida-per-aziende\/\"},\"wordCount\":1447,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/technofluid.it\/#organization\"},\"image\":{\"@id\":\"https:\/\/technofluid.it\/certificazioni-impianti-industriali-guida-per-aziende\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/technofluid.it\/wp-content\/uploads\/2026\/02\/xv3yifpeve4.jpg\",\"articleSection\":[\"News\"],\"inLanguage\":\"en-GB\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/technofluid.it\/certificazioni-impianti-industriali-guida-per-aziende\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/technofluid.it\/certificazioni-impianti-industriali-guida-per-aziende\/\",\"url\":\"https:\/\/technofluid.it\/certificazioni-impianti-industriali-guida-per-aziende\/\",\"name\":\"Certificazioni impianti industriali: guida completa per aziende\",\"isPartOf\":{\"@id\":\"https:\/\/technofluid.it\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/technofluid.it\/certificazioni-impianti-industriali-guida-per-aziende\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/technofluid.it\/certificazioni-impianti-industriali-guida-per-aziende\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/technofluid.it\/wp-content\/uploads\/2026\/02\/xv3yifpeve4.jpg\",\"datePublished\":\"2025-11-20T13:03:32+00:00\",\"description\":\"Scopri come ottenere le certificazioni impianti industriali per garantire sicurezza, conformit\u00e0 e competitivit\u00e0. Leggi la guida per aziende ora!\",\"breadcrumb\":{\"@id\":\"https:\/\/technofluid.it\/certificazioni-impianti-industriali-guida-per-aziende\/#breadcrumb\"},\"inLanguage\":\"en-GB\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/technofluid.it\/certificazioni-impianti-industriali-guida-per-aziende\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\/\/technofluid.it\/certificazioni-impianti-industriali-guida-per-aziende\/#primaryimage\",\"url\":\"https:\/\/technofluid.it\/wp-content\/uploads\/2026\/02\/xv3yifpeve4.jpg\",\"contentUrl\":\"https:\/\/technofluid.it\/wp-content\/uploads\/2026\/02\/xv3yifpeve4.jpg\",\"width\":1600,\"height\":1200,\"caption\":\"Impianto industriale galleggiante in mare, utilizzato per processi industriali marittimi.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/technofluid.it\/certificazioni-impianti-industriali-guida-per-aziende\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/technofluid.it\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Certificazioni impianti industriali &#8211; guida per aziende\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/technofluid.it\/#website\",\"url\":\"https:\/\/technofluid.it\/\",\"name\":\"Technofluid S.R.L.\",\"description\":\"Dal 1999 siamo specializzati nell&#039;impiantistica navale, idraulica, civile e industriale\",\"publisher\":{\"@id\":\"https:\/\/technofluid.it\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/technofluid.it\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-GB\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/technofluid.it\/#organization\",\"name\":\"Technofluid\",\"url\":\"https:\/\/technofluid.it\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\/\/technofluid.it\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/technofluid.it\/wp-content\/uploads\/2025\/12\/technofluid_bianco-logo.webp\",\"contentUrl\":\"https:\/\/technofluid.it\/wp-content\/uploads\/2025\/12\/technofluid_bianco-logo.webp\",\"width\":350,\"height\":116,\"caption\":\"Technofluid\"},\"image\":{\"@id\":\"https:\/\/technofluid.it\/#\/schema\/logo\/image\/\"},\"description\":\"La Technofluid S.r.l. nasce nel 1999 a Barcellona Pozzo di Gotto, in provincia di Messina, con l\u2019obiettivo di diventare un punto di riferimento nel settore dell\u2019impiantistica navale, idraulica, civile e industriale.\",\"email\":\"info@technofluid.it\",\"telephone\":\"0907386877\",\"legalName\":\"Technofluid S.R.L\",\"vatID\":\"IT03148240835\",\"taxID\":\"03148240835\",\"ownershipFundingInfo\":\"https:\/\/technofluid.it\/azienda\/\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/technofluid.it\/#\/schema\/person\/80ee7c2040b86b800d310c42f0e4916e\",\"name\":\"w4y\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\/\/technofluid.it\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/583e390083ec779c22b151a42e696481325a21e6ee736f04992a9c082a961329?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/583e390083ec779c22b151a42e696481325a21e6ee736f04992a9c082a961329?s=96&d=mm&r=g\",\"caption\":\"w4y\"},\"url\":\"https:\/\/technofluid.it\/en\/author\/w4y\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Industrial plant certifications: complete guide for companies","description":"Discover how to obtain industrial plant certifications to ensure safety, compliance, and competitiveness. Read the guide for companies now!","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/technofluid.it\/en\/industrial-plant-certifications-guide-for-companies\/","og_locale":"en_GB","og_type":"article","og_title":"Certificazioni impianti industriali - guida per aziende","og_description":"Scopri come ottenere le certificazioni impianti industriali per garantire sicurezza, conformit\u00e0 e competitivit\u00e0. Leggi la guida per aziende ora!","og_url":"https:\/\/technofluid.it\/en\/industrial-plant-certifications-guide-for-companies\/","og_site_name":"Technofluid","article_published_time":"2025-11-20T13:03:32+00:00","og_image":[{"width":1600,"height":1200,"url":"https:\/\/technofluid.it\/wp-content\/uploads\/2026\/02\/xv3yifpeve4.jpg","type":"image\/jpeg"}],"author":"w4y","twitter_card":"summary_large_image","twitter_misc":{"Written by":"w4y","Estimated reading time":"8 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/technofluid.it\/certificazioni-impianti-industriali-guida-per-aziende\/#article","isPartOf":{"@id":"https:\/\/technofluid.it\/certificazioni-impianti-industriali-guida-per-aziende\/"},"author":{"name":"w4y","@id":"https:\/\/technofluid.it\/#\/schema\/person\/80ee7c2040b86b800d310c42f0e4916e"},"headline":"Certificazioni impianti industriali &#8211; guida per aziende","datePublished":"2025-11-20T13:03:32+00:00","mainEntityOfPage":{"@id":"https:\/\/technofluid.it\/certificazioni-impianti-industriali-guida-per-aziende\/"},"wordCount":1447,"commentCount":0,"publisher":{"@id":"https:\/\/technofluid.it\/#organization"},"image":{"@id":"https:\/\/technofluid.it\/certificazioni-impianti-industriali-guida-per-aziende\/#primaryimage"},"thumbnailUrl":"https:\/\/technofluid.it\/wp-content\/uploads\/2026\/02\/xv3yifpeve4.jpg","articleSection":["News"],"inLanguage":"en-GB","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/technofluid.it\/certificazioni-impianti-industriali-guida-per-aziende\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/technofluid.it\/certificazioni-impianti-industriali-guida-per-aziende\/","url":"https:\/\/technofluid.it\/certificazioni-impianti-industriali-guida-per-aziende\/","name":"Industrial plant certifications: complete guide for companies","isPartOf":{"@id":"https:\/\/technofluid.it\/#website"},"primaryImageOfPage":{"@id":"https:\/\/technofluid.it\/certificazioni-impianti-industriali-guida-per-aziende\/#primaryimage"},"image":{"@id":"https:\/\/technofluid.it\/certificazioni-impianti-industriali-guida-per-aziende\/#primaryimage"},"thumbnailUrl":"https:\/\/technofluid.it\/wp-content\/uploads\/2026\/02\/xv3yifpeve4.jpg","datePublished":"2025-11-20T13:03:32+00:00","description":"Discover how to obtain industrial plant certifications to ensure safety, compliance, and competitiveness. Read the guide for companies now!","breadcrumb":{"@id":"https:\/\/technofluid.it\/certificazioni-impianti-industriali-guida-per-aziende\/#breadcrumb"},"inLanguage":"en-GB","potentialAction":[{"@type":"ReadAction","target":["https:\/\/technofluid.it\/certificazioni-impianti-industriali-guida-per-aziende\/"]}]},{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/technofluid.it\/certificazioni-impianti-industriali-guida-per-aziende\/#primaryimage","url":"https:\/\/technofluid.it\/wp-content\/uploads\/2026\/02\/xv3yifpeve4.jpg","contentUrl":"https:\/\/technofluid.it\/wp-content\/uploads\/2026\/02\/xv3yifpeve4.jpg","width":1600,"height":1200,"caption":"Impianto industriale galleggiante in mare, utilizzato per processi industriali marittimi."},{"@type":"BreadcrumbList","@id":"https:\/\/technofluid.it\/certificazioni-impianti-industriali-guida-per-aziende\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/technofluid.it\/"},{"@type":"ListItem","position":2,"name":"Certificazioni impianti industriali &#8211; guida per aziende"}]},{"@type":"WebSite","@id":"https:\/\/technofluid.it\/#website","url":"https:\/\/technofluid.it\/","name":"Technofluid S.R.L.","description":"Since 1999 we have specialised in marine, plumbing, civil and industrial installations","publisher":{"@id":"https:\/\/technofluid.it\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/technofluid.it\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-GB"},{"@type":"Organization","@id":"https:\/\/technofluid.it\/#organization","name":"Technofluid","url":"https:\/\/technofluid.it\/","logo":{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/technofluid.it\/#\/schema\/logo\/image\/","url":"https:\/\/technofluid.it\/wp-content\/uploads\/2025\/12\/technofluid_bianco-logo.webp","contentUrl":"https:\/\/technofluid.it\/wp-content\/uploads\/2025\/12\/technofluid_bianco-logo.webp","width":350,"height":116,"caption":"Technofluid"},"image":{"@id":"https:\/\/technofluid.it\/#\/schema\/logo\/image\/"},"description":"Technofluid S.r.l. was founded in 1999 in Barcellona Pozzo di Gotto, in the province of Messina, with the aim of becoming a point of reference in the field of naval, hydraulic, civil, and industrial plant engineering.","email":"info@technofluid.it","telephone":"0907386877","legalName":"Technofluid S.R.L","vatID":"IT03148240835","taxID":"03148240835","ownershipFundingInfo":"https:\/\/technofluid.it\/azienda\/"},{"@type":"Person","@id":"https:\/\/technofluid.it\/#\/schema\/person\/80ee7c2040b86b800d310c42f0e4916e","name":"w4y","image":{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/technofluid.it\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/583e390083ec779c22b151a42e696481325a21e6ee736f04992a9c082a961329?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/583e390083ec779c22b151a42e696481325a21e6ee736f04992a9c082a961329?s=96&d=mm&r=g","caption":"w4y"},"url":"https:\/\/technofluid.it\/en\/author\/w4y\/"}]}},"_links":{"self":[{"href":"https:\/\/technofluid.it\/en\/wp-json\/wp\/v2\/posts\/51440","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/technofluid.it\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/technofluid.it\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/technofluid.it\/en\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/technofluid.it\/en\/wp-json\/wp\/v2\/comments?post=51440"}],"version-history":[{"count":1,"href":"https:\/\/technofluid.it\/en\/wp-json\/wp\/v2\/posts\/51440\/revisions"}],"predecessor-version":[{"id":51441,"href":"https:\/\/technofluid.it\/en\/wp-json\/wp\/v2\/posts\/51440\/revisions\/51441"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/technofluid.it\/en\/wp-json\/wp\/v2\/media\/51442"}],"wp:attachment":[{"href":"https:\/\/technofluid.it\/en\/wp-json\/wp\/v2\/media?parent=51440"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/technofluid.it\/en\/wp-json\/wp\/v2\/categories?post=51440"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/technofluid.it\/en\/wp-json\/wp\/v2\/tags?post=51440"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}